摘要
城轨交通机电系统以往都是按系统划分进行设计和施工的,效率低,建设工期长。随着科学技术的发展和设计施工手段的提高,工程建设模式逐步由非专业化向专业化、集成化和社会化方向转变和发展。在开展机电系统综合集成设计的同时,如何根据个系统设计内容、施工流程,采用先进的施工技术、工艺和手段,实现机电系统集成施工总承包进行探讨,并提出相关实施性建议。
In the past, the mechanical and electrical system of urban rail transit are divided according to system to carry on the design and construction, which has low efficiency and long construction period. With the de- velopment of science and technology and the improvement of design and construction methods, construc- tion mode gradually changed and developed from non - specialization to specialization, integration and socialization. While carrying on mechanical and electrical system integrated design, how to realize con- struction general contracting for the mechanical and electrical system integration according to the system design content, construction process, the use of advanced construction technology, process and method are discussed, and related suggestions are puts forward.
出处
《铁路工程造价管理》
2014年第1期55-59,共5页
Railway Engineering Cost Management
关键词
城轨交通工程
机电系统
集成
建设模式
施工承包
Urban rail transit engineering
Mechanical and electrical systems
Integration
Construction mode
Construction contract