摘要
“西电东送”是“西部大开发”的重要组成部分。要实现这一伟大战略目标还有许多值得研究和思考的问题。首先要有全局性的、综合性的长远规划 ;其次 ,要加强属政府行为的行业本身的前期工作 ;第三 ,要转变思路 ,要考虑水电建设与电网及整个电力建设的关系 ,以适应我国经济发展水平及可持续发展要求 ;第四 ,改革水利水电的管理体制 ,使之更加科学。在能源的优化配置中 ,水电的优化配置应该放在首位。西电东送的战略性工程主要有 :黄河上的大柳树和拉西瓦工程 ,金沙江上的溪洛渡、向家坝、虎跳峡、白鹤滩工程。虎跳峡和白鹤滩工程应加大前期工作力度。
The power transmission from west to east is an important component part in the stratagy of the Great Western Development In order to realize such great strategic goal, there are many problems worthy to be studied and considered Firstly, it needs an overall and comprehensive long term planning Secondly, the antecedent work should be strengthened Thirdly, we should shift our thinking to consider the relationship of hydropower construction, power grid and whole power construction in order to meet the needs of our economic development level and sustainable development Fourthly, the water resources and hydropower management system should be reformed to make it more scientific In the optimization allocation of energy, the hydropower optimization allocation should be placed in the first position The strategic project of power transmission from west to east mainly includes the Daliushu and Laxiwa hydropower projects on the Yellow River, the Xiluodu, Xiangjiaba, Hutiaoxia and Baihetan hydropower projects on the Jinsha River Especially, the Hutiaoxia and Baihetan hydropower projects should strengthened their antecedent work
出处
《水力发电》
北大核心
2000年第12期1-4,共4页
Water Power
关键词
西部大开发
西电东送
资源优化配置
战略性工程
the Great Western Development, power transmission from west to east, resources optimization deployment, strategic project