BIM技术在山东省会文化艺术中心大剧院双曲面壳体龙骨定位中的应用 被引量:8

Application of BIM in the Keel Location of Hyperboloid Shell in the Theatre of the Shandong Provincial Capital Cultural Arts Center
下载PDF
导出
摘要 山东省会文化艺术中心大剧院的3个场馆均为双曲面异形建筑,为使内层竹板完成面与设计效果一致,需精确定位龙骨。由于施工过程中槽钢定位发生偏移,无法直接从设计图纸上获得龙骨位置,借助BIM建模软件搭建大剧院壳体模型,根据设计图纸,先进行竹板排布,由此反推出龙骨的空间位置,解决龙骨精确定位的施工难题。 Three venues of the Shandong Provincial Capital Cultural Arts Center are all hyperboloid shaped building. In order to ensure the completed surface of the bamboo clappers on the inner layer meet the designed style, it is necessary to locating the keels precisely. Due to the deflection of the channel steel location in the construction, the keel location can't be got from the design drawing. By setting up the model of theatre shell by BIM modeling software and according to the design drawing, this paper introduce the method of arranging bamboo clappers firstly, thereby anti-deducing the spatial position of the keels and solving this construction problem finally.
出处 《施工技术》 CAS 北大核心 2014年第3期55-58,共4页 Construction Technology
基金 国家自然科学基金项目:项目利益导向的大型工程项目群服务驱动型组织研究(71072046)
关键词 建筑信息模型 壳体 建模 双曲面 轻钢龙骨 可视化 building information modeling ( BIM ) shells modeling hyperboloid light steelkeel visualization
  • 相关文献

参考文献11

  • 1张建平,李丁,林佳瑞,颜钢文.BIM在工程施工中的应用[J].施工技术(下半月),2012,41(8):10-17. 被引量:624
  • 2赵灵敏,岳广飞.山东省文化中心项目BIM应用实践[J].土木建筑工程信息技术,2011,3(4):51-57. 被引量:19
  • 3张学斌.BIM技术在杭州奥体中心主体育场项目设计中的应用[J].土木建筑工程信息技术,2010,2(4):50-54. 被引量:26
  • 4何关培.BIM和BIM相关软件[J].土木建筑工程信息技术,2010,2(4):110-117. 被引量:342
  • 5桂珍.公切圆图解法[J].安徽机电学院学报,1997(4):78-80. 被引量:2
  • 6中国建筑工程总公司.轻钢龙骨隔断墙施工工艺标准[S]北京:中国建筑工业出版社,2004.
  • 7Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].AUTOMATION IN CONSTRUCTION,2011,(02):167-180.
  • 8Cheng Jianhua,Wang Hui. Application and popularizing of BIM technology in project management[A].2010.7-9.
  • 9中国建筑工程总公司.轻钢龙骨隔断墙施工工艺标准[S]北京:中国建筑工业出版社,2004.
  • 10Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].AUTOMATION IN CONSTRUCTION,2011,(02):167-180.

二级参考文献19

  • 1张建平,曹铭,张洋.基于IFC标准和工程信息模型的建筑施工4D管理系统[J].工程力学,2005,22(S1):220-227. 被引量:108
  • 2黄亚斌.企业级BIM应用实施步骤(一)[J].土木建筑工程信息技术,2011,3(2):56-61. 被引量:10
  • 3Eastman C,Teicholz P,Sacks R. BIM handbook[M].New Jersey:John Wiley and Sons,Inc,2010.
  • 4Yang D,Eastman C M. A rule-based subset generation method for product data models[J].Computer-Aided Civil and Infrastructure Engineering,2007,(02):133-148.doi:10.1111/j.1467-8667.2006.00476.x.
  • 5Singh V,Gu N,Wang X. A theoretical framework of a BIMbased multi-disciplinary collaboration platform[J].Automation in Construction,2011,(02):134-144.
  • 6Liu Qiang,Zhang Jianping,Li Ding. Research of building information modeling and model transformation technology based on the IFC[A].2012.
  • 7Zhang Jianping,Hu Zhenzhong. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety prohlems during construction: 1 principles and methodologies[J].Automation in Construction,2011.155-166.
  • 8Hu Zhenzhong,Zhang Jianping. BIM-and-4D-based integrated solution of analysis and management for conflicts and structural safety problems during construction:2.development and site trials[J].Automation in Construction,2011.167-180.
  • 9Liang Xiong,Lu Ming,Zhang Jianping. Integration of as-built and as-designed models for positioning control during construction[J].Automation in Construction,2011,(03):234-246.
  • 10www.solibri.com .

共引文献967

同被引文献25

引证文献8

二级引证文献36

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部