摘要
山东省会文化艺术中心大剧院的3个场馆均为双曲面异形建筑,为使内层竹板完成面与设计效果一致,需精确定位龙骨。由于施工过程中槽钢定位发生偏移,无法直接从设计图纸上获得龙骨位置,借助BIM建模软件搭建大剧院壳体模型,根据设计图纸,先进行竹板排布,由此反推出龙骨的空间位置,解决龙骨精确定位的施工难题。
Three venues of the Shandong Provincial Capital Cultural Arts Center are all hyperboloid shaped building. In order to ensure the completed surface of the bamboo clappers on the inner layer meet the designed style, it is necessary to locating the keels precisely. Due to the deflection of the channel steel location in the construction, the keel location can't be got from the design drawing. By setting up the model of theatre shell by BIM modeling software and according to the design drawing, this paper introduce the method of arranging bamboo clappers firstly, thereby anti-deducing the spatial position of the keels and solving this construction problem finally.
出处
《施工技术》
CAS
北大核心
2014年第3期55-58,共4页
Construction Technology
基金
国家自然科学基金项目:项目利益导向的大型工程项目群服务驱动型组织研究(71072046)
关键词
建筑信息模型
壳体
建模
双曲面
轻钢龙骨
可视化
building information modeling ( BIM )
shells
modeling
hyperboloid
light steelkeel