鲁棒性项目调度中缓冲设置方法 被引量:8

Buffer management in robust project scheduling
原文传递
导出
摘要 研究应对不确定因素的鲁棒性项目调度,针对其所用时间缓冲区技术中的两种重要方法——集中缓冲和STC(starting time criticality)分散缓冲,采用仿真模拟实验,以项目管理库中的帕特森例1为对象,进行详细的比较研究.研究结果表明,分散缓冲法具有更好的解鲁棒性;当活动时间的不确定性程度较大时,集中缓冲法的质量鲁棒性较好;当项目工期较紧时,分散缓冲法具有更好的鲁棒性.这些研究结论为管理者在特定的项目环境下选择合适的缓冲方法提供了决策依据. The robust project scheduling dealing with project uncertainties is studied. A simulation experiment with the project of Patterson 1 in project scheduling problem library(PSPLIB) is set up to compare two important methods of time buffering technology in robust project scheduling: Critical Chain centralized buffer and starting time criticality(STC) scattered buffer. The experiment results show that, the scattered buffer method always acts well in solution robustness. The larger the uncertainty of activity time is, the better the centralized buffer method in quality robustness will be. When the project deadline is very tight, the scattered buffer method is preferred in both kinds of robustness. These research conclusions provide decision supports for managers to choose the appropriate buffer method in the specific environment.
出处 《控制与决策》 EI CSCD 北大核心 2014年第2期368-372,共5页 Control and Decision
基金 国家自然科学基金项目(71271097) 国家自然科学青年科学基金项目(71201119)
关键词 鲁棒性项目调度 集中缓冲 分散缓冲 质量鲁棒性 解鲁棒性 robust project scheduling; centralized buffer; scattered buffer; quality robustness; solution robustness
  • 相关文献

参考文献15

  • 1Demeulemeester E, Herroelen W. Project scheduling?A research handbook[M). Boston: Kluwer Academic Publishers, 2002.
  • 2Zhu G, BardJ, Yu G. Disruption management for resource constrained project scheduling[J].J of the Operation Research Society, 2005,56(4): 365-381.
  • 3WangJ. Constraint-based schedule repair for product development projects with time-limited constraints[J]. IntJ of Production Economics, 2005, 95(3): 399-414.
  • 4Herroelen W S, Leus R. Project scheduling under uncertainty: Survey and research potentials[J]. EuropeanJ of Operational Research. 2005. 165(2): 289-306.
  • 5Newmann M EJ. The structure and function of complex networks[J]. Society for Industrial and Applied Mathematics, 2003, 45(2): 167-256.
  • 6Herroelen W S, Leus R. Stability and resource allocation in project planning[J]. lIE Transactions. 2004. 36 (7): 667- 682.
  • 7Al-Fawzan M A. Haouari M. A bi-objective model for robust resource-constrained project scheduling[J]. IntJ of Production Economics, 2005. 96(2): 175-187.
  • 8Goldratt E M. Critical chain[M]. New York: The North River Press, 1997.
  • 9Herroelen W S, Leus R. The construction of stable project baseline schedules[J]. EuropeanJ of Operational Research. 2004, 156(3): 550-565.
  • 10Van de Vonder S. Demeulemeester E, Herroelen W. et al. The use of buffers in project management: The trade?off between stability and makespan[J]. IntJ of Production Economics, 2005. 97(2): 227-240.

同被引文献90

引证文献8

二级引证文献53

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部