Study on Application of Highwall Mining System under Weak Geological Condition in Thailand
Study on Application of Highwall Mining System under Weak Geological Condition in Thailand
摘要
The EGAT Mac Moh coal mine is an open-cut coal mine in Thailand that produces about 16 million tons of lignite annually to generate 2,400 MW of electricity. The surface mine pit covers is 4 km by 7 km with mining depths ranging up to 260 m. A large pit slope is formed with the progression of the mining operation. However, massive slides in the pit slope occur often due to the existence weak planes such as faults and bedding, and the weak mechanical properties of the rocks. Hence, 200 m to 300 m boundaries of rock block including coal seams are left in front of faults in order to prevent slides and maintain the stability of the pit slope. As a result, there are significant coal reserves beneath the abandoned area along the pit slope. The focus of this paper is on the applicability and design of the highwall mining for recovering much of the coal left along the pit slope.
参考文献7
-
1H. Furukawa, K. Matsui, T. Sasaoka, II. Shimada, M. Ichinose. Applicable Underground Coal Milling System in Very, Thick Seams, in: Proceeding of the Mine Planning and the Equipment Selection, Banff Canada, 2009, CD-ROM.
-
2W.T. Seib, Australian Coal Mining Practice, The Australian Institute of Mining Metallurgy, 1993. pp. 238-242.
-
3Highwall systems, Coal Magazine (2006) 7-12.
-
4K. Matsui. T. Sasaoka, H. Shimada. T. Ueda, S. Kramadibrata, B. Sulislianto. tligh~vall mining systems at surface coal mines in Indonesia. Coal International 256 (3) (2008) 28-31.
-
5K. Matsui. tl. Shimada. T. Sasaoka. H. Furukawa. T. Ucda. A. Yabuki. et al.. High,vail stability of due to punch mining at opencut coal mines. International Journal of Surface Mining. Reclamation and Environment 18 (3) (2004) 185-204.
-
6A. Charoenpraxvat. S. Chuaviroj. C. Ilinthong. C. Chonlakmani, Geological Map of Thailand, Sheet Lampang (NE47-7). Scale 1:250,000, Geological Survey Division, Department of Mineral Resources, Bangkok. Thailand, 1995.
-
7ltasca Consulting Group, FLAC3D Ver. 2.1 Manual, 2002.
-
1Takashi Sasaoka,Tri Karian,Akihiro Hamanaka,Hideki Shimada,Kikuo Matsui.Application of highwall mining system in weak geological condition[J].International Journal of Coal Science & Technology,2016,3(3):311-321. 被引量:3
-
2沃尔沃建筑设备将携重量级新品亮相baumaChina2012[J].建筑机械化,2012,33(11):18-18.
-
3柳涛.太原地区地热资源应用技术研究[J].山西建筑,2013,39(15):103-105. 被引量:2
-
4Thailand Pavilion almost completed[J].China's Foreign Trade,2010(8):58-59.
-
5移动的钻井平台——比塞洛斯49HR旋转爆破钻孔机[J].模型世界,2010(10):74-75.
-
6Jafarimoghaddam Alireza,Khademi Hamidi Jafar,Najaf Mohammad.Application of decision tree to selection of MTBM for adverse geological conditions[J].International Journal of Mining Science and Technology,2013,23(4):499-507. 被引量:1
-
7李卫民.高科技处理矿山废物[J].世界有色金属,2009,34(12):24-25.
-
8陈启元.简化Bishop法和有限元法在某矿区基坑边坡稳定分析中的应用[J].现代矿业,2009,25(8):60-62. 被引量:5
-
9多斗挖掘机[J].工程机械文摘,1999(4):21-22.
-
10李博.煤矿采矿作业的常见事故与应对策略[J].中国科技博览,2014,0(43):377-377.