摘要
珠海电厂及送出配套工程 (首期 )投运 ,将使珠海和中山地区 2 2 0 k V电网的结构和正常运行方式产生重大变化。作者从运行方式研究出发 ,通过潮流与稳定分析和计算 ,讨论了大机组投运对珠海 2 2 0 k V电网的影响 ,并提出了有关对策 ,以保障珠海电网安全、稳定运行。
Putting Zhuhai power plant (first phase) and its transmission part in operation will tremendously influence the structure and operating mode of 220 kV power network in Zhuhai and Zhongshan District. Based on the research on operating mode and through the calculation of power flow and analysis of stability, the influence of putting large capacity generator in operation on 220 kV power network in Zhuhai is discussed. The relevant countermeasures are put forward to ensure the security of Zhuhai power network.
出处
《电网技术》
EI
CSCD
北大核心
2001年第2期65-68,共4页
Power System Technology
关键词
运行方式
安全措施
潮流分析
电网
电厂
operational mode
calculation and analysis
safety countermeasures