摘要
通过对一挡土墙后多年填土地基进行注浆加固的设计、施工和检验全过程介绍,分析了注浆法的加固原理,介绍了注浆施工工艺流程和效果检验方法,总结了注浆施工中的经验教训,重点对注浆法的适用性、注浆量的估算进行了探讨。
Through the introduction ofdcsigning construction and test ofa yearsfilling grouting-treat project,this article analyses the principle the process flow and the method of testing, summarizes the experiences and lessons in construction,investigates the applicability and estimating of grouting volume in focus
出处
《工程建设与设计》
2014年第2期123-125,128,共4页
Construction & Design for Engineering
关键词
注浆
填土
地基处理
挡土墙
grouting
fill ground
groundtreatment
retainingwall