恰甫其海工程坝基不良地质部分的处理措施及成果分析

Analysis of Treatment Measures of Adverse Geological Part in Qiafuqihai Project Dam Foundation,and Results Thereof
下载PDF
导出
摘要 恰甫其海工程坝基处理过程中发现F34断层和"葫芦状"冲刷坑有形成渗漏通道的危险,故对该不良地质条件进行了工程处理。对F34断层采取浇筑混凝土塞、增加灌浆数目以及对下游做反滤覆盖等工程处理措施;对冲刷坑具体措施为浇筑混凝土塞、增加固结灌浆的数量及深度等工程措施。 Dangers of fault F34 and leakage channel formed by 'gourd-like' scour pit are discovered in Qiafuqihai project dam foundation treatment process. The adverse geological conditions are treated. Concrete plug pouring, mortar filling increase, downstream reverse filtration coverage and other project treatment measures are adopted on fault F34. Concrete plug pouring, increase of consolidation grouting and depth, and other project measures are concretely adopted on scour pit.
作者 刘娟
出处 《水利建设与管理》 2014年第1期25-28,共4页 Water Conservancy Construction and Management
关键词 黏土心墙坝 冲刷坑 回填 混凝土塞 固结灌浆 clay core wall dam scour hole backfill concrete plug consolidation grouting
  • 相关文献

参考文献1

  • 1祁庆和.水工建筑物[M]北京:中国水利水电出版社,2004.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部