摘要
本文对石佛寺水库生态工程建设情况进行了简要介绍。重点阐述了蓄水后生态工程对闸门控制运用方式产生的影响、蓄水后闸门控制存在的问题及解决措施。通过增设钢叠梁检修闸门,形成开敞式溢流堰,蓄水调度运用方式由原来的全部利用泄洪闸门控制的方式改变为以自由溢流为主、闸门配合控制为辅的方式。解决了生态工程建设对泄洪闸大闸门控制运行中存在的问题,确保了石佛寺水库的防洪安全。
Shifosi Reservoir ecological project is briefly introduced in the paper. It focuses on describing the influence of ecological project after water accumulation on gate control operation mode, problems in gate control after water accumulation, and solutions. Open weir is formed by increasing steel stacked beam bulkhead gate. The water accumulation dispatch operation mode is changed from original mode of completely utilizing sluice gate into the mode based on free overflow assisted by gate cooperation control. The problems of ecological project construction in sluice large gate control operation are solved, thereby ensuring flood control safety of Shifosi Reservoir.