4Deroussi, L. , Gourgand, M. , Tchernev, N.. Combining Optimization Methods and Discrete Event Simulation: A Case Study in Flexible Manufacturing Systems[ C]. Service Systems and Service Management, 2006 International Conference on, 2006,1 (10) :495 -500.
5Leduc, R.J., Lawford, M., Pengcheng Dai. Hierarchical intcrface-based supervisory control of a flexible manufacturing system [ J ]. Control Systems Technology 2006,14 ( 4 ) : 654 - 668.
6Hong-Hee Lee, Gwan-Su Kim. Real time data communication using gateway for CAN and Profibus[ C]. Science and Technology, 2004. KORUS 2004. Proceedings. The 8th Russian- Korean International Symposium on 2004,1 (6) :219 - 223.
7Cavalieri, S. , Monforte, S. , Tovar, E. ; Vasques, F.. Evaluating worst case response time in mono and multi-master profibus DP Factory Communication Systems. 4th IEEE International Workshop on 2002:233 - 240.