期刊文献+

2012年以来我国焊管产业的发展形势及建议 被引量:9

Development Situation of Domestic Weld Tube-making Industry Since 2012 and Relevant Suggestions
下载PDF
导出
摘要 回顾并分析了2012年以后我国焊管产业的发展形势:2012年以来,世界经济形势不佳对我国焊管行业的影响已显现,焊管产量增幅大幅回落,焊管产能过剩与市场需求的矛盾更加突出,焊管出口率继续下降;2013年1—7月我国焊管产量增长缓慢,增幅继续回落,出口增速显著降低,出口价格继续下滑。提出了对策建议:努力开发高附加值焊管产品,积极推动焊管企业装备升级改造,开拓国际高端管线钢管市场。 Analyzed in the paper is the development situation of domestic weld tube-making industry since 2012. Negative influence by the depression of the global economy on domestic weld tube-making industry from the year has been manifested, for instance, tremendous falling of the output increase amplitude after a rise, the contradiction between surplus of the production capacity and the market demand being more obvious, and continual going down of the export proportion. From January to July, 2013, output growth of domestic weld tube industry had been sluggish, the increase amplitude continuously and remarkably going down, export growth rate failing down obviously, and the export price continuously declining. Based on the analysis, relevant suggestions are put forward, including making further efforts to develop high value-added products, actively promoting equipment upgrade and revamp of weld tube makers, and further tapping world market potential for high-end steel linepipes, etc.
作者 王晓香
出处 《钢管》 CAS 2014年第1期1-4,共4页 Steel Pipe
关键词 中国 焊管 发展形势 出口率 产业升级 技术改造 China weld tube development situation export proportion industrial upgrade technical revamp
  • 相关文献

二级参考文献5

  • 1李鹤林.中国焊管50年[M].西安:陕西科学技术出版社,2008:405.
  • 2Liessem Andreas, Grimpe Fabian, Oesterlein Ludwig. State-of-the-art quality control during production of SAW linepipes[C]//Proceedings of the Biennial Interna- tional Pipeline Conference, 2010.
  • 3Marlier O, Carrouge D, Jansen J P, et al. Europipe' s approach to consistently produce high quality pipes for today and tomorrow's market[C]. Ostend, 2009.
  • 4Dwyer Paul 0', Tazedakis Athanasios, Boothby Peter. Technical challenges of heavy wall HFW pipe produc- tion for Bord G6is Eireann pipeline project[C]//Pro- ceedings of the Biennial International Pipeline Confer- ence, 2010.
  • 5Hillenbrand H G, Kalwa C, Schroeder J. Meeting highest requirements for the challenge of the Nord Stream project[C]. 2009.

共引文献24

同被引文献100

引证文献9

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部