摘要
连续刚结构桥梁是桥梁施工的重要组成部分,为了保证桥梁施工的安全性与稳定性,就必须要对连续刚构桥梁的施工工作进行全程的控制与分析。本文主要分析连续刚构桥梁施工控制方式。
The continuous rigid structure bridge is an important part of the bridge construction. In order to ensure the security and stability of the bridge construction, the construction work of continuous rigid frame bridge should be controlled and analyzed during the entire process. This paper mainly analyzes the construction control method of continuous rigid frame bridge.
出处
《价值工程》
2014年第6期127-128,共2页
Value Engineering
关键词
连续刚构桥梁
施工控制
分析
continuous rigid frame bridge
construction control
analysis