高摩赞水利枢纽工程大坝溢流面常态混凝土与RCC大坝主体同步浇筑施工技术 被引量:6

Construction technique for synchronous placement of conventional concrete overflow surface and main RCC structure of dam for Gomal Zam Water Control Project
下载PDF
导出
摘要 本文介绍了高摩赞水利枢纽工程大坝溢流面常态混凝土与RCC碾压混凝土主体同步上升浇筑的施工原理、施工程序、施工方法和施工特点,并结合在高摩赞大坝工程中所取得的预期应用效果,得出该施工技术不仅有效保证了溢流面常态混凝土的施工质量,而且也不会由于溢流面常态混凝土的施工进度制约碾压混凝土筑坝施工技术所具有上坝强度高、缩短工期等优点的结论。 The principle,procedure,method and characteristics of the construction with the technology of the synchronous placement of both the conventional concrete overflow surface and the main RCC structure of the dam for Gomal Zam Water Control Project are described herein,and then a conclusion is made in combination with the expected application effect obtained from the construction of the dam that the construction technology cannot only effectively ensure the construction quality of the conventional concrete of the overflow surface,but can also not restrict the merits of the RCC Dam construction technique,i.e.high concrete placement intensity,short construction period,etc.
作者 史桂合
出处 《水利水电技术》 CSCD 北大核心 2014年第1期103-106,共4页 Water Resources and Hydropower Engineering
关键词 常态混凝土 RCC大坝 同步施工技术 高摩赞水利枢纽工程 conventional concrete RCC Dam synchronous construction technique Gomal Zam Water Control Project
  • 相关文献

参考文献3

二级参考文献5

共引文献4

同被引文献23

引证文献6

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部