摘要
综合阐述了珠江水利委员会科学研究所从 1983— 1998年间对飞来峡水利枢纽的整体布置、施工导流、泄洪、通航、截流、闸孔断面形式、闸下消能形式、闸下冲刷等所进行的一系列试验和研究工作 ,并介绍主要试验研究成果。
This paper summarizes a series of tests and investigations on general layout,construction diversion,flood disposal,navigation,river closure,form of gate opening section,pattern of energy dissipation and scouring under sluice carried out for Feilaixia Project by the Scientific Research Institute of PRWRC during the period from 1983 to 1998 and presents their major results.
出处
《人民珠江》
2001年第1期25-29,共5页
Pearl River
关键词
施工导游
截流
消能
泄洪
飞来峡水利枢纽
水工模型试验
construction diversion
river closure
project layout
energy dissipation
flood disposal
navigation
model test
Feilaixia Project