6[3]Gajpal P,Ganesh L,Rajendran C.Criticality analysis of spare parts using the analytic hierarchy process[J].International Journal of Production Economics,1994,35:293-298.
7[4]Ramanathan R.ABC inventory classification with multi-criteria using weighted linear optimization[J].Computer and Operations Research,2006,33:695-700.
8[7]R Dekker,MJ Kleijn,PJ de Rooij.A Spare Parts Stocking Policy Based on Equipment Criticality[J].International Journal of Production Economics,1998,56(3):69 ~ 77.
9[8]Chang PL,Chou YC,Huang MG.A (r,r,Q) inventory model for spare parts involving equipment criticality[J].International Journal of Production Economics,2005,97(1):66-74.
10Guide Jr V D R.Production planning and control for remanufacturing:Industry practice and research needs[J].Journal of Operation Management,2000,18:467-483.