基本建设控制工程变更及变更后投资控制的实践和思考 被引量:4

Controlling Project Alteration in Capital Costruction and the Praction and Consideration of Investmant Controlling After the Alteration
下载PDF
导出
摘要 基本建设项目投资超概算、超计划现象较为普遍 ,作者认为造成投资超支的主要原因是工程项目变更所引起的的投资额增加。要控制投资增加 ,主要是控制工程变更及变更后的投资控制。控制工程变更及变更后投资控制涉及到基本建设前期、设计、招投标、施工、工程决算等几个方面 ,作者从工作实践中认为设计和施工阶段是最主要的。本章从这两方面来论述应如何做好控制工程变更 。 Exceeding budgetary estimate and plan is very common in the investmentof capital construction. The main reason of exceeding investment budget is that the alteration of project can course an increase of investment.To control the increase,the Project alteration and the investment after the alteration have to be controlled. Controlling the project alteration and investment will involve in several aspects such as:capital construction setup,design and final accounting et al.. The paper states how to control the project alteration and the investment after the alteration from design and construction aspects which are considered as the most important according to the author's experience.
作者 陈顺华
出处 《基建优化》 2000年第6期40-41,50,共3页 Optimization of Capital Construction
关键词 变更 控制 Alteration Control
  • 相关文献

参考文献6

  • 1-.工程造价的确定与控制[M].中国计划出版社,1997..
  • 2-.工程造价管理相关知识[M].中国计划出版社,..
  • 3-.建设项目投资控制[M].中国地震出版社,..
  • 4-.工程建设定额基本理论与实务[M].中国计划出版社,..
  • 5-.浙江省建筑工程预算定额(上册、下册)[M].中国计划出版社,..
  • 6-.浙江省建设工程招标投标管理文件汇编[M].中国计划出版社,..

共引文献3

同被引文献10

引证文献4

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部