摘要
本文介绍了控制北京正负电子对撞机主隧道地面不平度的设计综合措施,这些措施亦可给类似的对不平度控制有高要求的工业建筑和科研建筑提供有益的启示。
In this paper, design measures to control unevenness of main tunnel floor of theBeijing Electron-Positron Collider project is introduced. The measures is useful in other design of indus-trial buildings and scientific research buildings to control unevenness of floor level.
出处
《工业建筑》
CSCD
北大核心
1991年第8期42-47,共6页
Industrial Construction