深坑酒店崖壁坑顶上的基础梁超长预应力锚索施工技术 被引量:2

Construction Technology for Super Long Prestressed Anchor Cable Applied to Foundation Beam on Steep Rock Pit Top for Deep Pit Hotel
下载PDF
导出
摘要 上海松江深坑酒店工程背倚山体、脚踏深坑,在如此复杂的地层条件下施工预应力锚索尤其困难,必须采取非常的手段弄清地层分布,为设计与施工提供支持。施工中采用了"一索一探"、钢套管护孔、导向帽等技术,以保证锚索施工的质量与效率,积累了宝贵的施工经验,可为今后同类工程施工提供借鉴。 Shanghai Songjiang Shenkeng hotel project leans against mountain, perching in a deep pit. The complicated geological condition makes prestressed anchoring very difficult, so proper measures should be taken to identify stratigraphic distribution to support the design. In construction, technologies like "one cable one exploration", steel sleeve, and guide cap ensured quality and efficiency of construction. Besides, valuable experience gained can be the reference for similar projects.
出处 《建筑施工》 2014年第1期8-9,12,共3页 Building Construction
关键词 深坑酒店 基础梁 预应力锚索 一索一探 入岩工程 Shenkeng hotel foundation beam prestressed anchor one cable one exploration in-rock construction
  • 相关文献

参考文献2

  • 1国家技术监督局;中华人民共和国建设部.锚杆喷射混凝土支护技术规范[S]{H}北京:中国计划出版社,2001.
  • 2中国国家标准化管理委员会.水利水电工程预应力锚固设计规范[S]{H}北京:中国电力出版社,2003.

同被引文献10

引证文献2

二级引证文献9

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部