4ALESSANDRO PERSONA, DARIA BATTINI, RICCARDO MANZINI, etal. Optimal safety stock levels of subassemblies and manufacturing components [ J ]. International Journal of Production Economics 110 (2007) 147 -159.
5De BODT M A, WASSENHOVE L V. Lot size and safety stocks in MRP: a case study [J]. Production and Inventory management 83, 1 -16.
6HUNG Yifeng, CHANG Chingbin. Determining safety stocks for production planning in uncertain manufacturing [ J ]. International Journal of Production Economics, 1999, 58:199 -208.
7MOLINDER. Joint optimization of lot_sizes, safety stocks and safety lead time in an MRP system [ J ]. International Journal of Production Research, 1997, 35 (4): 983-994.
8PAR BRANDER, ROLF FORSBERG, Determination of safety stocks for cyclic schedules with stochastic demands [ J]. International Journal of Production Economics 104 (2006) 271 -295.
9PING WANG, JAMES A HILL. Recursive Behavior of Safety Stock Reduction : The Effect of Lead - time Uncertainty [ J] , Decision Science, vol. 37, No. 2, May 2006.
10RICHARD HERRIN. How to calculate safety stocks for highly seasonal products [J]. The journal of business forecasting [J]. 2005, 24 (2) : 6 -10.