摘要
从施工前准备、基础验收、混合机安装、施工场地平面布置4个方面,对烧结厂二次混合机安装技术进行了总结。
From four aspects of construction preparation, foundation acceptance, mixing machine installation and site layout, this paper sums up the Installation technology of secondary mixing machine in sintering plant.
出处
《山西科技》
2014年第1期150-152,共3页
Shanxi Science and Technology
关键词
混合机安装
施工准备
基础验收
场地平面布置
installation of mixing machine
construction preparation
foundation acceptance
site layout