一种求解多执行模式资源水平问题的遗传算法 被引量:4

Genetic Algorithm for Resource Levelling Problem in Multi mode Project Scheduling
下载PDF
导出
摘要 针对资源受限情况下多执行模式工程调度中资源水平问题的特点 ,设计了一种遗传算法。解的编码采用满足紧前关系的工作链表与工作执行模式链表结合的双链表结构 ,交叉算子采用修正的一点交叉算法。为保证收敛解的可行性 ,在适值函数计算时对不可行解进行惩罚。对标准问题库 PSPL IB中大量问题的求解实验结果表明 。 A genetic algorithm for resource levelling problem in multi mode project scheduling is developed. An individual is represented by a pair of precedence feasible activity sequence list and mode assignment list. Modified one point crossover is taken as the crossover operator. To ensure the feasible solution, infeasible solutions in calculating fitness value is punished. The experiment results show that the genetic algorithm is effective for resource levelling problem.
出处 《控制与决策》 EI CSCD 北大核心 2001年第1期111-113,共3页 Control and Decision
基金 中国科学院现代制造 CAD/ CAM技术开发实验室资助项目 !(990 4)
关键词 工程调度 多执行模式 资源水平问题 遗传算法 project scheduling resource constraint multi mode resource levelling GA
  • 相关文献

参考文献4

  • 1[1] Demeulemeester E. Minimizing resource availability costs in time-limited project networks[J]. Management Science, 1995, 41(10): 1590-1598.
  • 2[2] Neumann K, Zimmermann J. Resource levelling for projects with schedule-dependent time windows[J]. European J of Operational Research, 1999, 117(3): 591-605.
  • 3[3] Kolisch R. Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation[J]. European J of Operational Research, 1996, 90(2): 320-333
  • 4[4] Kolisch R, Sprecher A. PSPLIB——A project scheduling problem library[J]. European J of Operational Research, 1996, 96(2): 205-216

同被引文献40

  • 1王宏,林丹,李敏强.求解模糊资源受限项目调度问题的遗传算法[J].系统工程学报,2006,21(3):323-327. 被引量:13
  • 2王延斌,王刚,赵立忠,高国安.基于蚁群算法的模具制造动态调度研究[J].计算机集成制造系统,2006,12(7):1028-1036. 被引量:9
  • 3COLORNI A, DORIGO M, MANIEZZO V, et al. Distributed optimization by ant colonies. Proc of European Confon Artificial Life [C]. Paris, 1991: 134-142.
  • 4PATTERSON J H, SLOWINSKI R, TALBOT F B, WEGLARZ J. An algorithm for a general class of precedence and resource - const rained scheduling problem [M ]//Slowinski, R. and Weglarz. Advances in project scheduling, Elsevier, Amsterdam, 1989, 3 -28.
  • 5BOCTOR F F. Heuristics for scheduling projects with resource restrictions and several resource - duration modes [ J ]. International Journal of Product ion Research, 1993, 31 : 2547 -2558.
  • 6BOCTOR F F. A new and efficient heuristic for scheduling projects with resource restrictions and multiple execution modes [ J ]. European Journal of Operational Research, 1996, 90 : 349 - 361.
  • 7Goldratt E M, Cox J. The Goal E M1. 2nd ED.Aldershot :Gower, 1993.
  • 8Goldratt E M. It's Not Luck[M]. Aldershot: Cower,1994.
  • 9Goldratt E M. Critical Chain [M]. MA.. The North River Press, 1997.
  • 10Rand G K. Critical chain: The theory of constraints applied to project management [J]. Int J of Project Management, 2000, 18(3): 173-177.

引证文献4

二级引证文献63

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部