摘要
介绍中贵线二标清管试压工程中的各个工序的施工要点,叙述清管试压工序的准备情况和施工情况,对施工效果进行总结。
This paper describes our company in the line of two standard pipe cleaning pressure test en- gineering each step of the construction points,paper, a detailed description of the Qing pipe pressure test process of prepare the case and the construction of the situation, and the project' s construction effect carried out a summary.
出处
《清洗世界》
CAS
2014年第1期1-6,9,共7页
Cleaning World
关键词
资源配备
线路分段
清管试压
resources and equipment:the line segmentation
pipeline pigging and pressure test