摘要 托管架基本设计流程是一个复杂的循环过程,涉及铺管船推进力、张紧器张力、待铺设管道的尺寸和铺设水深等诸多参数的平衡和优选。通过下弯段管道在弯曲、拉伸和外压综合荷载作用下的极限承载能力分析,求解了铺管船推进力和张紧器拉力,推导了托管架长度的参数公式。以2500米水深铺设12英寸管道为例计算了所需的托管架曲率半径和设计长度,完成了托管架基本设计。 Basic stinger design process is a complicated cycle process, which involves choosing appropriate parameters of pipelaying vessel thruster force, tensioner tension, the pipe diameter and water depth, etc during the basic stinger design. Repeated optimizations are always needed to obtain the best values. The thruster force and tensioner tension are obtained based on the ultimate bearing capacity analysis of the submarine pipe under large bending, tension and external pressure. The basic stinger design parameter's equation is proposed A practical deepwater S-lay stinger basic design case is carried out for the 2500-meter-water depth to lay 12-inch pipe.
作者 谢鹏 岳前进
出处 《船舶工程》 北大核心 2014年第1期109-112,共4页 Ship Engineering
关键词 S型管道铺设 极限承载能力分析 托管架 悬链线 S-type pipelaying ultimate bearing capacity analysis stinger catenary
  • 相关文献

参考文献8

  • 1R.J. Brown, A. Palmer. Developing Innovative Deep Water Pipeline Construction Techniques with Physical Models[J]. Journal of Offshore Mechanics and Arctic Engineering, 2007, 129(1): 56-60.
  • 2A. Palmer, Ca Hutchinson, J. Ells. Configuration ofSubmarine Pipelines during Laying Operations[J]. Transactions of the ASME: Journal of Engineering for Industry, 1974, 96:1112-1118.
  • 3A.C. Palmer, R.A. King. Subsea Pipeline Engineering[M]. PennWell Books, 2004.
  • 4Y. Bai, Q. Bai. Subsea Pipelines and Risers[M]. Elsevier Science Limited, 2005.
  • 5GA. Jensen. Offshore Pipelaying Dynamics[D]. Norwegian University of Science and Technology, 2010.
  • 6党学博,龚顺风,金伟良,李志刚,赵冬岩,何宁.深水海底管道极限承载能力分析[J].浙江大学学报(工学版),2010,44(4):778-782. 被引量:15
  • 7顾永宁.海底管线铺管作业状态分析.海洋工程,1988,6(2):11-23.
  • 8龚顺风,陈源,金伟良等.深水海底管道s型铺设形态分析[c].第十四届中国海洋(岸)工程学术讨论会论文集,2009:123-129.

二级参考文献12

  • 1周承倜,马良.海底管道屈曲及其传播现象[J].中国海上油气(工程),1994,6(6):1-8. 被引量:11
  • 2闫澍旺,肖智旺,田英辉.单重保温管海底管线在铺设状态的层间剪力分析[J].海洋技术,2005,24(2):89-92. 被引量:4
  • 3BAI Yong, BAI Qiang. Subsea pipelines and risers [M]. Oxford: Elsevier Science Ltd, 2005: 41- 65.
  • 4BAI Yong, IGLAND R T, MOAN T. Tube collapse under combined external pressure, tension and bending [J]. Marine Structure, 1997, 10(5): 389-410.
  • 5KYRIAKIDES S, CORONA E. Mechanics of offshore pipeline [M]. Oxford: Elsevier Science Ltd, 2007:225 - 238.
  • 6PALMER A C, HUTCHINSON G, ELLS J W. Configuration of submarine pipelines during laying operations [J]. Journal of Engineering for Industry, 1974, 96 (11) : 1112 - 1118.
  • 7MOHAREB M. Plastic interaction relations for pipe sections [J]. Journal of Engineering Mechanics, 2002, 128(1) ; 112 - 120.
  • 8HAUCH R S, BAI Yong. Bending moment capacity of pipes [J]. Journal of Offshore Mechanics and Arctic Engineering, 2000, 122(4) : 243 - 252.
  • 9API Specification 5L: specification for line pipe [S]. Washington, D. C. : American Petroleum Institute, 2000.
  • 10Gu, Yongning.ANALYSIS OF PIPELINE BEHAVIOURS DURING LAYING OPERATION[J].China Ocean Engineering,1989,4(4):477-486. 被引量:8

共引文献25

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部