软土地区基坑开挖对临近高铁影响数值仿真分析 被引量:52

Numerical Simulation and Analysis of Influence of Foundation Pit Excavation on Adjacent High-speed Railway in Soft Soil Area
下载PDF
导出
摘要 研究目的:随着临近高铁的上跨和下穿道路工程日益增多,大量新建道路等基坑工程位于高铁路基或桥梁保护范围以内,使得高铁结构不可避免地受到基坑施工的影响,在软土地区更为严重。本文以天津地区临近某高铁的道路下穿高铁工程为背景,运用ABAQUS软件建立三维数值分析模型,对不同距离、不同挖深、不同封闭式路堑节段的基坑施工过程进行了数值仿真分析。研究结论:(1)基坑施工引起的高铁路基和框构桥梁的附加差异沉降量、轨道的平顺性均满足规范要求。基坑开挖会引起高铁路基和框构桥的隆起变形,封闭式路堑浇筑后隆起变形减小;(2)施工过程中,基坑开挖为关键风险阶段,当施工至远离高铁72 m以外的基坑时,剩余节段施工对高铁基本无影响;(3)施工过程中应尽量减小每次的开挖量,按照每节独立开挖浇筑的工序进行,尽可能地将施工影响控制在极小的范围内,以免影响铁路运营的安全性和舒适性;(4)本文研究成果可以为临近高铁工程建设提供一定的理论依据,对软土地区临近高铁的基坑开挖有一定的参考意义。 Research purposes: As adjacent projects that cross over or going through under high - speed railway are gradually increasing, and lots of new highway foundation pit work located around high - speed railway subgrade or bridge protection sphere, the railway will inevitably be influenced by those engineering constructions. Based on a highway project adjacent to a high -speed railway, the 3d numerical analysis model has been built by using ABAQUS software, the construction process of different distance, different excavation depth and different u - shape groove segments is analyzed. Research conclusions: ( 1 ) The additional differential settlement and track irregularity meets the code requirements. The subgrade and frame bridge will rebound induced by pit excavation, and the rebound deformation will decrease after u- shape groove pouring. (2) During the whole construction process, the pit excavation is the key risk stage, the residual u - shape groove segment construction will have no effect when the pit work 72 m away from high - speed railway has finished. (3) In order to reduce the influence to the existed railway and ensure the safety and comfort of railway, the railway foundation deformation influenced by pit excavation should be fully considered and limited to a small range, decrease each step excavation volume. According to reasonable procedure, independent sequential pit excavation and pouring are performed. (4) This paper provides the theoretical evidence for the construction of the adjacent high -speed railway project and also provides the valuable reference to the study on the foundation pit excavation on adjacent high- speed railway in soft soil area.
出处 《铁道工程学报》 EI 北大核心 2014年第2期41-47,共7页 Journal of Railway Engineering Society
关键词 基坑开挖 高速铁路 路基和框构桥 数值仿真 有限元 pit excavation high- speed railway subgrade and frame bridge numerical simulation finite element
  • 相关文献

参考文献2

二级参考文献7

共引文献47

同被引文献292

引证文献52

二级引证文献233

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部