摘要
在冷热电联供系统集成技术的基础上,提出了冷热电联供模式的矿井降温系统的设计方案和基于PLC控制器和工控机的井下降温系统控制方案;控制系统软件采用WinCC编写,实际运行情况表明,冷热电联供系统运行平稳、能源利用效率高。
On the basis of integration teehnology of combined eooling heating and power system (CCHP) , the article proposes mine cooling design scheme based on CCHP and mine cooling control scheme based on the PI,C controller and industrial computer. The con- trol program is compiled with Vc'inCC software. Actual operation shows that CCHP system runs smoothly and has high energy efficiency.
出处
《煤矿安全》
CAS
北大核心
2014年第2期100-101,共2页
Safety in Coal Mines
基金
"十二五"科技部科技支撑计划资助项目(2012BAK04B00)