4GUGLIELMETTI V,GRASSO P,MAHTAB A,et al.Mechanized tunneling in urban areas:design methodology and construetion control[M].London,UK:Taylor and Francis Group,2008:392 -402.
5MAI R J.TunNelling ang geotechnics:new horizons[J].Geotéchnique,2008,58(9):695-736.
6LIAO S M,LIU J H,WANG R L,et al.Shield tunneling and environment protection in Shanghai soft ground[J].Tunnelling and Underground Spece Technology,2009,24(4):454-465.
7SUGIYAMA T,HAGIWARA T,NOMOTO T,et al.Observations of ground movements during tunnel construction by slurry shield method at the Docklands light railway Lewisham extension-east London[J].Soils and Foundations,1999,39(3):99-112.
8ESKESEN S D,TENGBORG P,KAMPMANN J,et al.Guidelines for tunnelling risk management:International Tunnelling Association,Working Group No.2[J].Tunnelling and Underground Space Technology,2004,19(3):217-237.
9PICKHAVER J A.Numerical modelling of building response to tunnelling[Ph.D.Thesis] [D].Oxford:Balliol College,University of Oxford,2006:23-42.