期刊文献+

中州氢氧化铝焙烧车间人工挖孔灌注桩设计

Design of Artificial Digging Piles in Zhongzhou Aluminium Hydroxide Roasting Workshop
下载PDF
导出
摘要 在铝工艺中 ,当设备布置集中 ,厂房高差较大 ,而地基又较复杂时 ,应正确确定地基基础方案 ,使其满足土建自身的强度、稳定要求 ,又符合工艺生产要求。通过中州铝厂焙烧车间的基础设计及试验 ,总结了适合该地区特点的基础形式 ,为后期工程应用提供了科学、可靠的依据。 In aluminium technology,equipments are sometimes placed closely of concerntrated,the difference of elevation of the workshop is very large,and the ground base is very complicated.Proper plans for the design of the foundation shall be made to meet the demand of the technology.The author of this article has summarized foundation according to the design and the test of the roasting workshop in Zhongzhou Aluminium Factory,which will provide sientific and reliable basis for the engineering later.
作者 贾茹
出处 《有色矿冶》 2000年第6期57-61,共5页 Non-Ferrous Mining and Metallurgy
关键词 地基方案 桩基设计 人工挖孔灌注桩 桩基测试 equipmints concerntration comlicated ground base foundation plan8
  • 相关文献

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部