期刊文献+

建筑物建造过程碳排放计算方法研究 被引量:20

Study on Calculation Methods of Carbon Emissions of Buildings during the Construction
原文传递
导出
摘要 从确定建筑物建造过程碳排放的计算边界入手,将建筑建造过程碳排放分解为基础工程、结构工程、装修工程、安装工程、场内运输和施工临设等六个部分,利用《全国统一建筑工程基础定额》中的机械台班消耗量和《全国统一施工机械台班费用定额》中的单位机械台班能源消耗量等基础数据,提出了建筑物建造过程碳排放计算模型。以北京某工程为例,介绍了建造阶段碳排放计算方法。 Starting from confirmation of the boundaries for calculating carbon emissions of buildings during the construction, this paper divides carbon emissions of buildings during the construction into foundation works, structural works, fitting-out works, installation works, internal transportation and temporary construction, uses mechanical machine-team consumption in National Unified Basic Quotas for Construction Foundations and unit mechanical machine-team energy consumption in National Unified Quotas for Machine-Team Expenses of Construction Machinery and proposes a calculation model for carbon emissions of buildings during the construction. Taking a project in Beijing as an example, this paper describes the calculation methods of carbon emissions at the construction stage.
出处 《建筑科学》 北大核心 2014年第2期8-12,共5页 Building Science
基金 国家"十二五"科技支撑计划项目"标准化绿色建筑研究与工程示范"(2012BAJ10B04) 住房和城乡建设部科技计划项目"中国建筑物碳排放通用计算方法研究"(2011-R1-1)
关键词 建造碳排放 基础定额 碳排放因子 计算模型 carbon emissions during the construction, basic quotas, carbon emission factor, calculation model
  • 相关文献

参考文献10

二级参考文献77

共引文献251

同被引文献140

引证文献20

二级引证文献28

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部