期刊文献+

九圩港闸闸下兴建桥梁工程模型试验研究

Study on the physical model of bridge construction downstream Jiuweigang barriers
下载PDF
导出
摘要 九圩港闸下新建桥梁工程,不能单独从泥沙问题来考虑其影响,还应考虑工程后对九圩港闸引、排水功能以及对闸上已有桥梁工程的影响。通过物理模型试验研究将较好地解决相关难题,为工程决策、设计提供科学依据。研究结果表明,桥梁工程方案实施后潮位最大壅高0.028 m,对流速影响较大的范围在桥轴线上下100 m之内,对九圩港闸引、排水流量的影响在3%以内。 The study on the bridge construction downstream Jiuweigang barriers includes the sediment-related issues, and the effects on the barriers diversion and drainage, as well as the exiting upstream bridge construction after the project implementa- tion should be considered. The related problems will be solved by the present physical model, and the scientific basis will be provided for the project policy decision and design. The results show that, after the implement of the bridge beams scheme, the maximum back water is about 0.028 m; the major influence region is within the range of 100 m up and down the bridge axis ; the later engineering influence on the diversion and drainage discharge is within 3 %.
出处 《中国港湾建设》 2014年第2期45-50,共6页 China Harbour Engineering
关键词 九圩港闸 桥梁工程 模型试验 引水 排水 流量 Jiuweigang barriers bridge construction physical model diversion drainage discharge
  • 相关文献

参考文献7

二级参考文献47

共引文献42

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部