连云港港庙岭三期试验区围堤工程施工 被引量:4

Construction of Retaining Dike for Pilot Area in Phase Ⅲof Miaoling Port Complex of Lianyungang Port
下载PDF
导出
摘要 连云港港庙岭三期集装箱和多用途泊位其陆域形成及地基处理试验区围堤采用抛石挤淤堤、抛石爆破挤淤堤和砂桩砂波堤三种结构形式。文章介绍了这三种围堤的施工工艺、施工中遇到的问题。 The Pilot area for land reclamation and soil improvement for the container berths and multi-purpose berths in Phase III of Miaoling Port Complex of Lianyungang Port was dammed with a retaining dike which was built with three different structures,namely,riprapping to displace muck,riprapping by blasting to displace muck,and sand piles and sand quilts.The paper presents the construction technology for the retaining dike,problems encountered during the construction and solutions to these problems as well as the effect of the three types of structures.
作者 王卫东 程琪
机构地区 连云港港务局
出处 《中国港湾建设》 2000年第6期45-48,共4页 China Harbour Engineering
关键词 围堤 抛石挤淤堤 抛石爆破挤液堤 砂桩砂被堤 施工工艺 连云港 retaining dike dike of riprapping to displace muck dike of riprapping by blasting to displace muck dike of sand pile and sand quilt construction technology
  • 相关文献

同被引文献34

引证文献4

二级引证文献47

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部