摘要
预制厂的设置对桥涵工程工期影响很大,通过几年的实践工作谈一谈预制厂在设置、设计、施工等几个方面的体会。
The location of prefabricating plant has obvious influence on bridges and culu-verts in construction period. This paper describes the location, design, construction of prefabricating plant in practice through several years practice.
出处
《辽宁省交通高等专科学校学报》
2000年第4期45-46,共2页
Journal of Liaoning Provincial College of Communications