国际工程索赔中共同延误的处理方法和实践

Approach and Practice for Concurrent Delay in International Engineering Project
下载PDF
导出
摘要 结合英国和国际市场上的建筑合同理论和实践,对目前国际市场上流行的关于共同延误的处理原则和方法予以总结和介绍,并进行简要评析,以期给我国从事国际工程的合同人员和相关研究者带来启发。 In accordance with related principle and practice of construction law in UK and international market, this paper tries to summarize and introduce some prevalent approaches and principles as well as offer a concise evaluation about concurrent delay, which frequently occurs in the practice of international engineering projects, so as to bring some degree of inspiration to Chinese contract specialists and researchers in the area of international engineering projects.
作者 何维
出处 《华北水利水电学院学报(社会科学版)》 2013年第6期64-66,共3页 Journal of North China Institute of Water Conservancy and Hydroelectric Power(Social Sciences Edition)
关键词 国际工程 共同延误 合同法 分摊法 international engineering projects concurrent delay contract law apportionment approach
  • 相关文献

参考文献4

  • 1Furst, S. Keating on Construction Contracts, 9'h edition [ M ]. London : Sweet & Maxwell ,2012.
  • 2May, A. Keating on Construction Contracts, 6'h edition [ M ]. London : Sweet & Maxwell, 1995.
  • 3Knowles, R. 200 Contractual Problems and their Solutions [ M ]. Oxford : Wiley-Blackwell,2012.
  • 4Eyssel|, K. Concurrent Delay [ :]. Charles Russell LLP, 2010,(7).