文章结合笔者全程参与的所在企业于2008-2010年以EPC的形式承包的越南公门煤泥水处理项目,从人员培训、系统调试、技术运行、性能测定、移交商业运行等方面,对EPC总承包开车管理进行总结分析,探讨提出如何在国际工程中做好EPC项目的开车管理。
Based on the EPC engineering practice of slime water treatment project in Gongmen Vietnam, the commissioning management of EPC project was summarized and analyzed, from the aspect of personnel training, system debugging, technical operations, performance measurement, and commercial operation transfer etc. , in order to discuss and propose the method to improve the commissioning management in international project.