期刊文献+

需求-服务匹配视角下的技术型知识员工任务指派问题研究

Study on Task Assignment Problem for Technical Knowledge Workers from Demand-service Matching Perspective
原文传递
导出
摘要 基于服务系统中需求-服务匹配视角对具有多种能力、异质效率的技术型知识员工任务指派问题进行分析,提出任务执行窗和可并行任务组概念,建立多阶段的员工分配决策路径图;然后,以任务-员工效率匹配度为目标建立优化模型,并运用动态规划法进行模型求解,确定员工任务指派最优路径,实现员工最优配置;最后,通过算例进行验证。 This paper analyses the task assignment problem for technical knowledge workers with multiple capabilities and heterogeneous efficiencies from a demand - service matching perspective. First, the concepts of task execution window and parallel task group are presented, and the project network diagram is transformed into the employees assignment decision path digram. Then, a model which satisfies maximum the matching degree of task - employee efficiencies is constructed, and the dynamic programming method is used to solve the model. By solving the model, the optimal employee - task appointing path and optimal allocation can be determined. Finally,it is verified with an example.
作者 刘艺文 李华
出处 《世界科技研究与发展》 CSCD 2014年第1期19-25,41,共8页 World Sci-Tech R&D
基金 陕西省科学技术研究发展计划项目(S2013KR2029) 中央高校基本科研业务费项目(72133634)资助
关键词 技术型知识员工 需求-服务匹配 任务指派 动态规划 technical knowledge worker demand-service matching task assignment dynamic programming
  • 相关文献

参考文献13

  • 1陈建安,李燕萍.管理类和技术类知识员工绩效特征的实证解析[J].经济管理,2008,34(11):61-66. 被引量:7
  • 2BELLENGUEZ O,EMMANUEL N. A Branch-and-Bound Method for Solving Multi-Skill Project Scheduling Problem[J].RAIRO-OPERATIONS RESEARCH,2007,(02):155-170.
  • 3WALTER M,ZIMMERMANN J. A Heuristic Approach to Project Staffing[J].Electronic Notes in Discrete Mathematics,2010.775-782.
  • 4FIKRI M,ALAOUI A E H,KHOMSSI M E. Assignment Staff with Dynamic Competencies in Multi-Projects & Multi-Periods:Modelling and Solving by a Hybridization of Ant Colony Algorithm[J].International Journal of Computer Science and Network Security,2011,(03):227-240.
  • 5VALLS V,PEREZ A,QUINTANILLA S. Skilled Workforce Scheduling in Service Centres[J].European Journal of Operational Research,2009,(03):791-804.
  • 6黄洪钟,李丽,刘伟.并行工程中设计任务的动态调度[J].机械工程学报,2002,38(z1):164-167. 被引量:12
  • 7芦鹏宇,孙文俊,井瑞.基于时间片段的多IT项目人力资源调度问题求解[J].系统工程理论与实践,2012,32(4):731-737. 被引量:8
  • 8ACUNA S T,JURISTO M. Assigning People to Roles in Software Projects[J].Software:Practice and Experience,2004,(07):675-696.
  • 9ACUNA S T,JURISTO N,MORENO A M. Emphasizing Human Capabilities in Software Development[J].IEEE SOFTWARE,2006,(02):94-101.
  • 10OTERO L D,CENTENO G,RUIZ-TORRES A J. A Systematic Approach for Resource Allocation in Software Projects[J].Computers &Industrial Engineering,2009,(04):1333-1339.

二级参考文献54

共引文献35

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部