6Allan Astru PJense,Arne Rernrnen.Life cycle management-introduction to sustainability and life cyele thinking[J].LCM slide Show,APL,2005:17-29.
7YU Jingwei,HUANG Xiaoming,Liao Gongyun.Expressway asphalt pavement structure evaluation method frame based on LCCA[C].ICTE 2009:Proceedings of International Conference on Transportation Engineering 2009,ASCE,2009:3645-3650.
8Krizan W.J.Construction management-for-fee:Boswell Engineering's mission is protecting the public purpose[J].Engineering New Record.2000,244(24):100-105.
9Gransberg D.D.,Senadherra S.P.Design-build contract award methods for transportation projects[J].Journal of Transportation Engineering,1999,125(6):565-567.
10Chan A.P.C.,Ho D.C.K.,Tam C.M.Design and build project success factors multivariate analysis[J].Journal of Construction Engineering and Management,2001,127(2):93-100.