主体填充墙砌筑施工技术方案

Main Body Filler Wall Masonry Construction Technical Plan
下载PDF
导出
摘要 从主体填充墙砌筑的施工准备、主要施工技术措施、质量保证措施三方面进行了论述,提出了坚持"三交底"制度。在交任务的同时交质量、交安全,确保砌筑工程质量得到有效控制。做好成品保护工作,提高成品保护意识,遵循"谁破坏谁修复,谁负责谁保护"的原则,确保填充墙分项工程达到优良。 From the main body filler wall masonry construction preparation, main construction technical measures, quality assurance measures three aspects discussed in this paper, adhere to the "three clarification" system is proposed. In the task of quality, safety, and at the same time to effectively control to ensure the quality of building engineering. To do a good job of product protection, improve the finished product protection consciousness, follow the"whoever damage repair, who is in charge of who to protect"principle, to ensure good filler wall component project is achieved.
作者 郭金珠
出处 《科技与创新》 2014年第1期63-63,67,共2页 Science and Technology & Innovation
关键词 拉结筋 填充墙 施工技术 质量保证 rachel reinforcement filler wall construction technology quality assurance
  • 相关文献

参考文献3

  • 1中华人民共和国住房和城乡建设部.蒸压加气混凝土建筑应用技术规程[S]北京:中国建筑工业出版社,2009.
  • 2中华人民共和国住房和城乡建设部;中华人民共和国国家质量监督检验检疫总局.砌体工程施工质量验收规范[S]北京:光明日报出版社,2011.
  • 3中华人民共和国住房和城乡建设部;中华人民共和国国家质量监督检验检疫总局.砌体工程现场检测技术标准[S]北京:中国建筑工业出版社,2011.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部