摘要 近年来,大量的连续梁桥在强烈地震中出现了构件破坏甚至发生了整体倒塌的现象,因此需要对大跨度连续梁桥的倒塌破坏机理进行研究。结合一座大跨度连续钢箱梁桥,本文首先通过LS-DYNA建立了其动力显式有限元模型,然后通过倒塌仿真分析得到该连续梁桥在强震作用下的破坏模式,重点对比分析了不同地震波及其输入作用下的破坏特征。结果表明,在强震作用下,该连续梁桥的桥墩最先发生破坏,且边主跨间的桥墩尤应引起关注;考虑竖向地震后,桥梁的破坏模式发生了改变。 Recently, the failure phenomenon of the component in many continuous beam bridges have appeared even the whole structure collapse under the frequency strong earthquakes. Therefore, it is necessary to research the mechanism of the collapse and failure of long-span continuous beam bridge. Based on a long-span continuous steel-box beam bridge, a dynamic explicit finite model is established through the software of LS-DYNA in this paper at first. Subsequently, the failure modes of the bridge under strong earthquake are conducted by the analysis of collapse simulation, and the failure features of the bridges under difierent seismic waves and their inputs are compared emphatically. The results show that the failure piers are firstly happened of the continuous beam bridge and the piers between the main span and the side span should be pain attention. The failure modes of the bridge have a change after considering the vertical seismic wave.
出处 《工程抗震与加固改造》 北大核心 2014年第1期57-60,134,共5页 Earthquake Resistant Engineering and Retrofitting
关键词 连续梁桥 强震作用 倒塌仿真 破坏模式 continuous beam bridge strong earthquake collapse simulation failure mode
  • 相关文献

参考文献5

二级参考文献29

  • 1袁万城,闫冬.斜拉桥纵飘频率简化计算方法[J].同济大学学报(自然科学版),2005,33(11):1423-1427. 被引量:28
  • 2张宇峰,徐宏,倪一清.大跨桥梁结构健康监测及安全评价系统研究与应用进展[J].公路,2005,50(12):22-26. 被引量:26
  • 3陈刚.混凝土桥梁的病害处理[J].铁道工程学报,2006,23(5):70-72. 被引量:14
  • 4严国敏.韩国圣水大桥的倒塌[J].国外桥梁,1996(4):47-50. 被引量:8
  • 5WILLIAMSON E B. Evaluation of Damage and P - A Effects for Systems under Earthquake Excitation [ J ]. Journal of Structural Engineering, ASCE, 2003, 129 (8) : 1036 - 1046.
  • 6MIRANDA E, AKKAR D. Dynamic Instability of Simple Structural Systems [ J]. Journal of Structural Engineering, ASCE, 2003, 129 (12): 1722-1726.
  • 7KRAWINKLER H, SENEVIRATNA G D P K. Pros and Cons of a Pushover Analysis of Seismic Performance Evaluation [J]. Engineering Structures, 1998, 20 (4- 6) : 452 - 464.
  • 8CHI W M. EL-TAWIL S, DEIERLEIN G G, et al Inelastic Analysis of a 17-story Steel Framed Building Damaged during Northridge [ J ]. Engineering Structures, 1998, 20 (4-6): 481-495.
  • 9KIM S, D'AMORE E. Push -over Analysis Procedure in Earthquake Engineering [ J]. Earthquake Spectra, 1999, 115 (3) : 417 -434.
  • 10GOEL R K, CHOPRA A K. Evaluation of Modal and FEMA Pushover Analyses: SAC Buildings [ J ]. Earthquake Spectra, 2004, 20 (1):225-254.

共引文献174

同被引文献21

引证文献2

二级引证文献10

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部