基于挣值技术的工期索赔数学分析方法 被引量:1

Mathematic Analysis Method for Schedule Claim Based on Earned Value Technology
下载PDF
导出
摘要 在工程项目尤其是大型水电工程实施期间工期难免会发生变化,要么工期延误,要么业主要求提前完工或赶回前期耽误的工期。非承包商原因导致工期延误或加速施工(赶工)时会增加费用导致索赔。为有效量化索赔费用,根据合同执行过程中已知工期、投标报价、实际结算、进度数据,基于挣值分析法(EVA),采用数学模型技术(MMT)寻求工期变更索赔费用计算的一般数学方法。 The schedule is inevitably changed in the construction of projects, especially for large hydropower projects, because of schedule delay or employer required ahead of schedule and acceleration. The delays and acceleration not caused by contractors usually leads to schedule claim. In order to effectively quantify claim costs, the Earned Value Analysis (EVA) and Mathematics Model Technology (MMT) are used to study the general calculation method of schedule claims according to schedule plan, tender offer, interim payment and actual schedule.
作者 陈广森
出处 《水力发电》 北大核心 2014年第3期79-81,共3页 Water Power
关键词 合同管理 工期索赔 费用 数学模型技术 挣值分析法 contract management schedule claim cost Mathematics Model Technotogy(MMT) Earned Value Analysis (EVA)
  • 相关文献

参考文献5

  • 1GIBSON R. Construction Delays:Extensions of Time and Prolongation Claims[M].London:Taylor & Frances Group,2008.
  • 2Thomas R. Construction Contract Claims[M].New York:Palgrave Macmillan,2001.
  • 3白思俊.现代项目管理[M]北京:机械工业出版社,2002.
  • 4陈广森,杨雄晖.基于MMT和EVA的景洪水电站项目基建统计分析[J].项目管理技术,2011,9(10):75-79. 被引量:3
  • 5王勇红;陈广森;吕洋.基于MMT&PERT的赶工索赔费用计算[J]中华建设科技,2010(05).

二级参考文献4

  • 1中国建设监理协会.建设工程投资控制[M].北京:中国建筑工业出版社,2011.
  • 2Roger Gibson. Construction delays: extensions of time and prolongation claims [ M ]. Abingdon: Taylor & Francis Group, 2008.
  • 3邹恒甫.计量经济学[M].武汉:武汉大学出版社,2000.
  • 4樊思林,张婷.基建统计在计划管理中的监督和参谋作用[J].中国水利,2007(18):33-35. 被引量:2

共引文献2

同被引文献1

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部