摘要
阐述了隧道施工地质工作方法 ,主要包括长短期超前地质预报、进一步准确鉴别围岩类别、监测、判断。
The paper briefly describes the method of geological work for tunnel construction,which consists of four parts ①The long and short term previous forecast of geology ②The precise expertise of surrounding rock subject to the tunnel design,③monitoring, judgement and preventing great geological disaster,④putting forward the corresponding prevention and treatment countermeasures for different conditions of surrounding rock
出处
《石家庄铁道学院学报》
2000年第4期1-5,共5页
Journal of Shijiazhuang Railway Institute
关键词
超前地质预报
围岩类别
地质灾害
施工方法
previous forecast of geology
geological disaster
tunnel construction method
expertise of surrounding rock