摘要
泰州中国医药城会展中心钢结构工程单体多,工期紧,现场条件复杂,施工组织难度大。通过钢结构设计复核过程中对初步设计的一些合理补充和修改,如优化次结构的结构形式,更改屋面围护结构的构造,采取大吨位吊机固定站位吊装的方法,减少临时设施的使用,提高施工效率,从而保证在预定工期内顺利完成施工。
The steel structure engineering of Taizhou Chinese Medicine City Exhibition Center has numerous constructions, tight schedule, complicated working conditions and difficult construction organization. Based on some supplement and modification of the preliminary design in the process of the steel structure design review, such as optimization of the structure style of the secondary structure, the construction of the maintenance structure was changed. By taking a construction method of large tonnage crane hoisting at fixed position, the use of temporary facilities is reducing, the efficiency of construction is improved, the construction within the scheduled time is completed assuringly.
出处
《钢结构》
2014年第1期29-32,35,共5页
Steel Construction
关键词
大跨结构
钢结构
设计复核
优化设计
施工技术
long-span structure
steel structure
design review
optimization design
construction technique