期刊文献+

泰州大桥系杆拱预应力刚性吊杆一次张拉模型试验研究 被引量:6

Study on One-time full Tension Model Test of Tied Arch Prestressed Concrete Rigid Suspension Cable of Taizhou Bridge
下载PDF
导出
摘要 泰州大桥主孔是一座下承式系杆拱桥 ,为满足引江河工程进度的需要 ,对吊杆进行了设计研究 ,采用了预应力刚性吊杆一次张拉完成的施工工艺。为确保施工安全和质量 ,达到设计要求 ,进行了室内吊杆张拉模型试验 ,得出的技术结论用于指导实桥施工。 The main span of Taizhou Bridge is a through tied arch.Study on the design of the suspension cable and one-time full tension construction technology of prestressed concrete rigid suspension cable are carried out to meet the need of Yinjiang River Project.In order to ensure the construction safety & quality and to meet the requirement of the design, a model test on the suspension cable tension is undertaken first, and the technical result is used to guide the on?site construction of the bridge.
出处 《公路交通科技》 CAS CSCD 北大核心 2000年第6期41-44,共4页 Journal of Highway and Transportation Research and Development
关键词 系杆拱桥 刚性吊杆 一次张拉 模型试验 Tied arch bridge Rigid suspension cable One-time full tension Model test
  • 相关文献

同被引文献32

引证文献6

二级引证文献26

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部