龙江水电站枢纽工程主要技术问题研究与工程措施

Key technologies and structural measures for Longjiang Hydropower Station
下载PDF
导出
摘要 龙江水电站枢纽工程处于高震区,坝址区地质条件复杂,工程技术难度很高。围绕建设期工程主要技术问题,相继开展了一系列专题研究和科研试验工作,提出工程处理措施和方案,成功解决了拱坝基础地质问题、抗震问题、坝体混凝土温控问题、火山灰掺和料应用问题及引水压力钢岔管优化问题等关键技术问题,成效理想,为工程建设提供了坚实的技术支撑,也积累了宝贵经验。 Longjiang Hydropower Station is located in earthquake-prone area, with complicated geological condition at the dam site that caused great difficulties for technology application. A series of special subject studies and scientific experiments have been conducted in order to overcome key technical obstacles. Solutions have been proposed regarding to geology of arch dam foundation, anti-earthquake, temperature control of dam body concrete, application of volcanic ash admixture and optimization of steel bifurcated pipe. The results are satisfactory that provide solid technical foundation for the project with accumulation of valuable experiences.
作者 孙庚宁
出处 《中国水利》 2014年第4期25-28,共4页 China Water Resources
关键词 龙江水电站 技术问题 研究 工程措施 Longjiang Hydropower Station technical problem study structural measures
  • 相关文献

参考文献6

  • 1中水东北勘测设计研究有限责任公司.龙江水电站枢纽工程拱坝坝肩地质缺陷处理及坝基抬高优化设计专题报告[R].2010.
  • 2河海大学.龙江水电站枢纽工程双曲地质力学模型三维有限元分析研究[R].2010.
  • 3中水东北勘测设计研究有限责任公司.龙江水电站枢纽工程防震抗震研究设计专题报告[R].2010.
  • 4中国水利水电科学研究院.龙江水电站枢纽工程双曲拱坝温度应力及温控措施研究[R].2009.
  • 5中水东北勘测设计研究有限责任公司科学研究院.龙江水电站枢纽工程混凝土配合比及热学性能试验成果报告[R].2008.
  • 6中国水利水电科学研究院.龙江水利枢纽工程混凝土掺合料性能试验研究报告[R].2008.

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部