龙江水电站枢纽工程建设监理部科学规范监理工作,对大坝施工过程进行质量控制、进度控制、投资控制、合同管理、信息管理、安全文明施工监督管理、监理协调等,并严格审批施工措施,认真贯彻"业主(建设单位)、设计、监理、施工"四位一体的管理理念,以合同为基础充分发挥参加单位的积极性。
Supervising department of Longjiang Hydropower Station has played an important role in control of project quality, construction schedule and investment, as well as management of contract and information, safety of construction and coordination. Based on the contract, the roles of project owner, designer, supervisor and constructor had brought into full play that contributed to the realization of objectives in each phase of dam construction.
出处
《中国水利》
2014年第4期33-34,16,共3页
China Water Resources
关键词
科学发展观
工程监理
龙江水电站枢纽工程
scientific development outlook
project supervision
Longjiang Hydropower Station