关于河南省城际铁路建设时序的研究 被引量:1

Study on Construction Time Sequence of Inter-city Railways in He'nan Province
下载PDF
导出
摘要 城际铁路的建设时序是政府部门和运输企业等决策的重要依据,特别是在当前铁路改革的新形势下,铁路建设时序的重要程度日益显著。考虑河南省城际铁路建设规划中存在的问题及相关政策的变化,从影响建设时序的多种因素出发进行剖析,利用定性与定量相结合的方法,分析河南省规划城际铁路的建设时序,即建设先后次序为郑登洛城际铁路、郑新城际铁路、机许城际铁路、许平城际铁路。 The construction time sequence of inter-city railways is an important basis of decision- making by government departments and transport enterprises, especially under new status of current railway reform, the construction time sequence are gradually important. Considering the problems existing in inter-city railways construction plan in He'nan province and changes of relative policies, starting from multi-factors influencing construction time sequence, this paper analyzes the construction time sequence of planed inter-city railways in He'nan province by using qualitative method combined with quantitative method, the construction sequence of inter-city railways are: Zhengzhou-Dengfeng-Luoyang, Zhengzhou-Xinxiang, Zhengzhou Airport-Xuchang, and Xuchang- Pingdingshan.
作者 马海龙 罗雪
出处 《铁道运输与经济》 北大核心 2014年第2期84-87,共4页 Railway Transport and Economy
关键词 城际铁路 建设时序 关联度 专家评估法 Inter-city Railway Construction Time Sequence Corelation Expert Evaluation Method
  • 相关文献

参考文献1

  • 1铁道第三勘测设计院集团有限公司.河南省城际铁路建设运营管理模式研究[R]天津:铁道第三勘测设计院集团有限公司,2012.

同被引文献11

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部