摘要 大口径长距离岩石地层顶管施工技术在我国油气管道工程中得到越来越多地运用。文章通过对大口径长距离岩石地层顶管施工中制约正常掘进的主要因素的介绍,结合西气东输二线东段顶管隧道施工工作情况,阐述了顶管机头的刀盘、刀具、膨润土泥浆配置与压力、施工过程中的控制因素等现场管控要素在顶管施工中对总体掘进施工的影响。对各项因素的分析结果也为类似的顶管施工提供了经验。 The technology of pipe jacking construction in rocky stratum for large diameter long-distance pipelines is more and more used in China's oil and gas pipeline projects. In this paper, the main factors restricting the normal boring operation in rock stratum in pipe jacking construction of large diameter long-distance pipeline are analyzed, and combined with the actual situation in tunnel construction site of the eastern section of the Second West to East Gas Pipeline, the main effect of influencing factors, such as cutter header, cutters, bentonite mud preparation and pressure, control factors in construction course, on overall pipe-jacking construction are illustrated. The analysis results provide experience for similar pipe jacking construction projects.
出处 《石油工程建设》 2014年第1期38-41,共4页 Petroleum Engineering Construction
关键词 岩石地层 顶管施工 外壁摩阻力 膨润土泥浆 控制 rocky stratum pile jacking construction friction resistance on outer wall bentonite mud control
  • 相关文献

参考文献5

二级参考文献1

  • 1马保松 D.Stein[德国],蒋国盛等编著.顶管和微型隧道技术,人民交通出版社(北京),2004.

共引文献17

同被引文献9

引证文献4

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部