摘要
针对某铁路连续梁施工中出现的钢束施工偏差,进行了详细的计算分析,并根据现场实际情况,提出了可实施性方案,处理后的连续梁检算满足规范各项指标要求,可为今后类似工程的设计提供借鉴。
Steel beams for the construction of a railway deviation continuous beam construction appeared, carried out a detailed calculation and analysis, and in accordance with the actual situation, put forward a variety of treatment options proposed scheme can be implemented, continuous beam Computation of post-processing to meet the specifications of each indicators required to provide a reference for the design of future similar projects.
出处
《工程建设与设计》
2014年第3期102-105,共4页
Construction & Design for Engineering
关键词
连续梁
底板钢束
径向力
continuous beam
bridge floor steel
beams rein forced radial force