期刊文献+

火电厂建设管理中应加强的几个环节分析

Analysis of the Management Should be Strengthened in the Coal-fired Power Plant Construction Several Parts
下载PDF
导出
摘要 近年来,随着我国电力事业的迅猛发展,工程建设项目不断增多,情况也变得日益复杂,这对工程质量控制提出了更高的要求。电力建设工程与一般的工程项目有所不同,特别是火电厂建设工程,其不仅具有建设周期较长、质量影响因素多、规模大、投资大等特点,而且工期较紧,施工作业难度非常大,若是某个环节出现问题,则后果非常严重。为此,加强火电厂建设工程项目管理就显得尤为重要。基于此,论文就火电厂建设管理中应加强的几个环节进行分析。 In recent years, with the rapid development of out country electric power industry, increasing engineering project construction, is also becoming increasingly complex, it puts forward higher requirements on engineering quality control. Electric power construction projects are different from common engineering projects, especially in power plant construction projects, it not only has a long construction cycle, the factors influencing the quality, scale, great investment, and the time limit is tight, construction difficulty is very big also, ifa certain link problems, consequence is very serious. Therefore, it is very important to strengthen the construction of coal- fired power plant project management. Based on this point, in this paper, the thermal power pl ant construction and management should b e strengthened in several parts to discuss.
出处 《工程建设与设计》 2014年第3期143-145,共3页 Construction & Design for Engineering
关键词 火电厂 建设工程 质量管理 coal-fired power plant constructionproject quality management
  • 相关文献

参考文献6

二级参考文献3

共引文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部