摘要 围绕核电工程项目管理的长期性和复杂性,介绍了为实现核电工程项目管理目标而进行的管理绩效改进的基本原理。分析了AP1000自主化依托项目为解决日益复杂的挑战和问题而进行的管理绩效改进新实践,在提升资源使用效率、管理标准化和风险缓解方面的收益,说明了管理绩效改进在核电工程建设中举足轻重的作用。 As to the long period and complexity of the project management of the nuclear power plant, this paper introduced the basic theory of the performance improvement plan in order to achieve the objectives of the project management of the nuclear power plant. In order to solve the more and more complex challenges and problems, AP 1000 self-reliance project practiced the performance improvement plan, which had great improvement in the resource usage, management standardization, and risk mitigation, so that performance improvement plan was approved to have great benefits inproj ect management of the nuclear power plant.
作者 金叶 高宇龙
出处 《工程建设与设计》 2014年第3期146-147,共2页 Construction & Design for Engineering
关键词 核电工程 项目管理 AP1000自主化依托项目 管理绩效改进 nuclear power plant project project management AP 1000 self-reliance project performance improvement
  • 相关文献

参考文献5

  • 1方振邦,罗海元.战略陛绩效管理[M].北京:中国人民大学出版社,2011.
  • 2刘昕,曹仰锋.绩效管理[M].北京:中国人民大学出版社,2011.
  • 3刘美凤,方圆媛(2011).绩效改进[M].北京:北京大学出版社.
  • 4秦杨勇.平衡积分卡与绩效管理一中国企业战略制导[M].北京:中国经济出版社,2011.
  • 5孙仪,杨生斌.绩效分析与改进[M].北京:中国人民大学出版社,2010.

共引文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部