摘要
本文结合龙王庙大桥 2 #墩承台的施工过程 ,提出了钢板桩围堰的设计思路 ,介绍了钢板桩围堰在半水半陆中基础施工的应用情况。
Connecting with the construction process of the base slab of No.2 pier of Longwangmiao Bridge,this paper puts forward a design of steel sheet pile coffer and introduces its applying situation in semiwater and semiterrence foundation construction.
出处
《科技情报开发与经济》
2000年第2期64-65,共2页
Sci-Tech Information Development & Economy