期刊文献+

高温再热蒸汽管道下沉原因分析及处理 被引量:13

Analysis on Reason for Sinking of High Temperature Reheat Steam Pipeline and Disposal Measures
下载PDF
导出
摘要 某电厂高温再热蒸汽管道在吹管后出现异常下沉,恒力弹簧吊架普遍处于下极限位置。通过分析找出导致管道下沉的主要原因,并针对此提出了新增3组恒力弹簧吊架,更换2组恒力弹簧吊架的处理方案以及高温蒸汽管道下沉的预防建议,方案实施后管道下沉问题得到有效解决。 The high temperature reheat steam pipeline of some power plant is abnormally sinking after blowpipe and the con-stant force spring hanger is generally lying in a limit inferior location.Therefore,this paper tries to find out the main reason for sinking on the basis of analysis and proposes disposal measures of newly increasing three groups of constant force spring hangers and changing two groups of constant force spring hangers and related precaution suggestion for preventing sinking of the high temperature reheat steam pipeline.The problem of sinking of the steam pipeline is effectively solved after imple-menting the above disposal measures.
机构地区 苏州热工研究院
出处 《广东电力》 2014年第1期5-8,共4页 Guangdong Electric Power
关键词 高温再热蒸汽管道 下沉 恒力弹簧吊架 选型错误 预防 high temperature reheat steam pipeline sinking constant force spring hanger wrong model selection precau-tion
  • 相关文献

参考文献10

二级参考文献26

共引文献63

同被引文献49

引证文献13

二级引证文献23

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部